Try our beta test site
IMPORTANT: Listing of a study on this site does not reflect endorsement by the National Institutes of Health. Talk with a trusted healthcare professional before volunteering for a study. Read more...
6 studies found for:    14644851 [PUBMED-IDS]
Show Display Options
Rank Status Study
1 Completed Efficacy Study on Symptomatic Control of Patient With Knee Osteoarthritis Between 14% of Plai (Plaivana®) to Placebo Gels
Condition: Knee Osteoarthritis
Intervention: Drug: Plavina cream
2 Completed
Has Results
Structured Non-operative Treatment of Knee Osteoarthritis
Condition: Osteoarthritis of the Knee
Interventions: Other: Neuromuscular training (NEMEX-TJR);   Behavioral: Information;   Drug: Paracetamol;   Drug: Burana;   Drug: Pantoprazole;   Behavioral: Dietary counseling;   Behavioral: Patient education;   Other: Insoles
3 Completed THERMARTHROSE: Gonarthrosis and Water Cure
Conditions: Osteoarthritis, Knee;   Pain
Interventions: Drug: thermal cure;   Drug: 3 days access to watering place at 6 months
4 Completed
Has Results
Structured Treatment of Osteoarthritis of the Knee With or Without Total Knee Replacement
Condition: Osteoarthritis of the Knee
Interventions: Other: Neuromuscular training (NEMEX-TJR);   Drug: Paracetamol;   Drug: Burana;   Drug: Pantoprazol;   Behavioral: Dietary counseling;   Behavioral: Patient education;   Procedure: TKR;   Other: Insoles
5 Completed Efficacy Study of Intra-articular Hyaluronic Acid in the Knee Osteoarthritis
Condition: Osteoarthritis, Knee
Interventions: Device: Sinovial® (syringe containing sodium hyaluronate solution);   Device: Synvisc® ( syringe containing Hylan G-F 20 solution)
6 Not yet recruiting JOURNEY II XR Safety and Effectiveness PMCF
Conditions: Rheumatoid Vasculitis With Rheumatoid Arthritis of Knee;   Unilateral Post-Traumatic Osteoarthritis of Knee;   Knee Osteoarthritis;   Degenerative Arthritis Peripheral Joint;   Failed Osteotomies;   Failed Unicompartmental Replacement
Intervention: Device: JOURNEY II XR Total Knee System

Study has passed its completion date and status has not been verified in more than two years.